ArcelorMittal | Canal D Construction

Fermont, Québec

Another major project for our teams: the excavation of Canal D. Here are a few figures on the project:

  • 1.2 km of canal to be excavated
  • 12 500 m² of retention basin 2
  • 8 200 m³ of riprap
  • 64 000 m² of membrane to be laid
  • 97 200 m² of deforestation, equivalent to 13.5 soccer fields
Excavating the canal represents a major challenge, requiring advanced techniques and precise coordination. The considerable volumes of material to be moved, combined with the varied geological conditions, call for innovative solutions and rigorous resource management.

Year : 2024

Contract value : 7 700 000