ArcelorMittal | Zone 1-5 Pit A

Fermont, Quebec

The stripping work for PIT A (Zones 1 to 5) consists of removing surface materials in order to prepare the ground for subsequent excavation and mining phases. The work includes, but is not limited to:

  • Delineation and securing of work areas according to the planned sequence.

  • Removal of the organic soil layer, overburden, and non-exploitable surface materials.

  • Mechanical excavation using heavy equipment adapted to site conditions.

  • Loading and hauling of stripped materials to approved disposal, temporary stockpile, or waste areas.

  • Shaping and grading of stripped surfaces to ensure a platform that meets operational and safety requirements.

  • Management of slopes, access routes, and drainage to maintain ground stability.

  • Execution of the work in compliance with health and safety standards, environmental requirements, and applicable procedures.

Zones 1 to 5 are carried out in a sequential and coordinated manner to optimize work progress, equipment movement, and overall site productivity.

Year : 2025

Contract value : 14 000 000