ArcelorMittal | Zone 1-5 Pit A
Fermont, Quebec
The stripping work for PIT A (Zones 1 to 5) consists of removing surface materials in order to prepare the ground for subsequent excavation and mining phases. The work includes, but is not limited to:
-
Delineation and securing of work areas according to the planned sequence.
-
Removal of the organic soil layer, overburden, and non-exploitable surface materials.
-
Mechanical excavation using heavy equipment adapted to site conditions.
-
Loading and hauling of stripped materials to approved disposal, temporary stockpile, or waste areas.
-
Shaping and grading of stripped surfaces to ensure a platform that meets operational and safety requirements.
-
Management of slopes, access routes, and drainage to maintain ground stability.
-
Execution of the work in compliance with health and safety standards, environmental requirements, and applicable procedures.
Zones 1 to 5 are carried out in a sequential and coordinated manner to optimize work progress, equipment movement, and overall site productivity.
Year : 2025
Contract value : 14 000 000